Tank Pour Preparation

42,000 Gallon Wastewater Tank Pour

42,000 Gallon Wastewater Tank Pour

Site preparation for this 42,000 gallon septic tank involved excavation, forming, and water control.

42,000 Gallon Wastewater Tank Pour

42,000 Gallon Wastewater Tank Pour

42,000 Gallon Wastewater Tank Pour

This three-compartment septic tank has two interior walls to promote settling of solids.

ARAP Creek Crossing

42,000 Gallon Wastewater Tank Pour

Controls and Quad Pump Installation

Crossing waterways while running pipelines involves understanding Aquatic Resource Alteration Permit regulatory and technical requirements.

Controls and Quad Pump Installation

Controls and Quad Pump Installation

Controls and Quad Pump Installation

WYN installed these four pumps and a control panel to move water to the treatment 

Pipeline Road Crossing

Controls and Quad Pump Installation

Wastewater Pipeline Pipe Laying

This road crossing involved open-cutting a road to run two sleeves underneath for the pipelines.

Wastewater Pipeline Pipe Laying

Controls and Quad Pump Installation

Wastewater Pipeline Pipe Laying

Green PVC pipe is used for untreated "gray water" and purple PVC pipe is used for moving treated effluent for beneficial reuse purposes.